Europa Bridge
This is an asymmetrical cable stayed bridge, designed by António Reis. It has a total span of 329.4 m, with…
This is an asymmetrical cable stayed bridge, designed by António Reis. It has a total span of 329.4 m, with…
Nexclay was applied for a lightweight filling above and around the tunnel, thus ensuring reduced loads on the structure and…
In the tunnels of the Lisbon Airport, 297 kg/m³ of Nexclay Geotechnical was used to fill the roof, thus ensuring…
Due to its physical characteristics: low weight, resistance to compression, drainage ability and dimensional stability, Nexclay is ideal for lightweight…
Application of Nexclay in lightweight fillings of sub-bases of communication channels.
This work studied the use of lightweight landfill since the load capacity of the existing soils was quite weak. The…
The intervention included the rehabilitation of underground infrastructure, creating a new riverside promenade and staircase. In addition, it created a…
This is 2.9 km of tunnel that links Parc Nord and Sabadell Stations to complete the extension between Parc Nord…
Expanded clay Nexclay was applied in Brisa's works on the A14 motorway, for the execution of the light embankment of…
Nexclay expanded clay was used to reduce soil pressure on basement walls and avoid the soil settlement around the structure.…