skip to Main Content

Project Description

The “La Florida” Thermosolar Plant, in Alvarado, near Badajoz, has a rated power of 50 MW. The building works at the plant started in February 2008 and lasted a year and a half. The construction required the excavation of over one million cubic metres of earth – ACCIONA

Project Details

Badajoz, Espanha

Construction: Sendin pavimentos y Abastecimientos S.A.(SENPA)
Amount of Argex: 5800 m³

Back To Top